I took my time packing up this morning, drained the pipes, and headed over to the mountain around 9:30. I decide to check out the progress at the Ski Bowl on the way over. The base for the new lift was in place, and a crew was banging out the liftie shed.
The Lodge still had it’s underwear (Tyvek) showing. Another crew was burying the propane tank that will heat the building.





