That’s not a good job to have.That guy was there for a long time. I was wondering why, I didn’t ever hear him yell.
It’s one of the reasons folks took out tollbooths.
Does "Bridge Freezes Before
That’s not a good job to have.That guy was there for a long time. I was wondering why, I didn’t ever hear him yell.
I witnessed a female employee, who was very vocal. Doing a good job, in my opinion.That guy was there for a long time. I was wondering why, I didn’t ever hear him yell.
That sounds like a fun job... for awhile. Unless that floats yer boat.I witnessed a female employee, who was very vocal.
Looks like Belle uses workplace rotations for “Tappan Ski” bridge monitor.That guy was there for a long time. I was wondering why, I didn’t ever hear him yell.
IMO, no. I think they have achieved the goal of making that lift easily accessible from any trail on that side. I would argue the bridge, while not perfect, is a better setup than the way trails used to get funneled behind the old 7 lift line. That was a shit show when it got crowded.So it sounds like they blew it regarding the bridge at least- if not the whole lift replacement. Is that accurate?
I need to slow it down myself - ripping across it is a lot of fun. I’m surprised I didn’t get yelled at on Saturday.That sounds like a fun job... for awhile. Unless that floats yer boat.
Looks like Belle uses workplace rotations for “Tappan Ski” bridge monitor.
Gonna need it for that gig.
It's way better now than it was last season for everybody. My only complaint is that the new lift is kinda slow.So it sounds like they blew it regarding the bridge at least- if not the whole lift replacement. Is that accurate?
Ya forgot about going back to the board for more $ for moving earth/rocks on Goat Path while not finishing mid-station unload area indicated by the white star thingySo it sounds like they blew it regarding the bridge at least- if not the whole lift replacement. Is that accurate?