“This extension will total approximately 665 linear feet. With the realignment and extension, the lift will be 3,500 feet long and cover a 900-foot vertical.”
It’s adding 665 linear feet and about 55 vertical feet.
“This extension will total approximately 665 linear feet. With the realignment and extension, the lift will be 3,500 feet long and cover a 900-foot vertical.”
A rope tow coulda done that trick, simpler, funner and cheaper.It’s adding 665 linear feet and about 55 vertical feet.
Where did the Double Double start that was different then the Lightning? Looks the same on an old map.It should go detachable, start at the original location that the double double did
It’s adding 665 linear feet and about 55 vertical feet.“This extension will total approximately 665 linear feet. With the realignment and extension, the lift will be 3,500 feet long and cover a 900-foot vertical.”
It’s adding 665 linear feet and about 55 vertical feet.
Why on earth would anyone do that with the gondola right next door?Yes to mid station, haven’t heard anything about a carpet loader.
The new lower loading terminal adds a bunch of rope length and no vertical. They envision someone starting at Discovery lodge and riding lighting then new 7 to the top. That’s going to take a half hour on busy days.
No bridge for this year. That’s going to increase congestion at the corner of the overlook lodge.
Not sure if the new blue akin to Onondaga and ruining the goat path and utsy so intermediate skiers can get down is happening this year or next.
It’s a feature not a bug.The gondola doesn’t always work.