
a beautiful NYSB moment right there.
Sidewalk was poured at Disco today. It will be radiant heated to keep it free from snow and ice.
View attachment 30503
View attachment 30504
The sketchy steps to old Lift 7 are gone and the flagpole is missing.
View attachment 30505
2024
View attachment 30509
View attachment 30508
Insulation is going on the roof. The inside is full work zone. A new planter, that will get a stone facade, separates the patio which will also be heated. New windows and single exit doors.
View attachment 30510
2023
View attachment 30502
Overlook won’t be ready for quite some time. It is what it is. Hopefully we’ll get our beloved lodge back better than ever.